What AxiFloor
builds next
What is not built yet, in two stages. There are no dates: an item moves to the features page when it works on a real system.
Being built now
Work has started and a first version exists, but it is not ready for your plant yet.
Advanced configurable optimization
An order sequence that also weighs changeovers, cleaning and capacity, proposed for a planner to approve.
Machine integration
A prototype: machine signals shown beside the operator’s own Start and Stop at the station.
Watt, the manufacturing assistant
Answers questions about orders and the plant from the app’s own data; any change it proposes waits for approval.
Planned next
Designed and agreed, not started yet.
Plan revisions and history
Each saved plan kept as a revision, with who changed what and when, so a planner can compare and go back.
Proposals for late deliveries
When a new order cannot fit, a proposed later date with its consequences, for the planner to accept or change.
Changes in a shared plant inbox
Changes in SAP S/4HANA® that touch a saved plan, flagged in one inbox for the plant’s planners.
Recovery options for a disruption
For a breakdown or shortage, options to recover the plan, each checked and approved by a planner before anything changes.
See what works today
Book a demo and see AxiFloor on a real SAP S/4HANA Cloud Public Edition system.